On Saturday, Dec. 17, SDOT will close one lane on the Ballard Bridge to replace the traffic gate.
The right southbound lane on the Ballard Bridge will be closed from 6:30 a.m. to 10:30 p.m. as crews replace the 70-year-old traffic gate.
SDOT says the sidewalk will be open most of the time during construction.
Recent Comments